Celebration Evening….

Loading...
Posted in News | Comments Off on Celebration Evening….

Cambs Highways Open Day – Everyone Welcome

Posted in News | Comments Off on Cambs Highways Open Day – Everyone Welcome

Rotary Quiz – A Good Evening For All

Must pre-book – team size 8 max – contact Jim Saunders…..

Posted in News | Comments Off on Rotary Quiz – A Good Evening For All

WTC Full Council Meeting Agenda – 09th October 2019

Sorry about the ‘skew’ document – it is how I received it…I’ll straighten it out later.

Loading...

Posted in News | Comments Off on WTC Full Council Meeting Agenda – 09th October 2019

FDC Housing Enforcement

Loading...
Posted in Issues and Concerns, News | Comments Off on FDC Housing Enforcement

Beware Of Latest Telephone Scam ~##~

RW has just had a phone call from 0803 627577  Stating my broadband would be disconnected.  Please take note and advise the wider public please.

Posted in Crime Updates, Issues and Concerns, News | Comments Off on Beware Of Latest Telephone Scam ~##~

Hospital News – The Pulse

Our Hospital Trust Autumn Newsletter – Read by going to:-

http://octagon.org.uk/ebooks/nwa/pulse/autumn/2019

Posted in News | Comments Off on Hospital News – The Pulse

Kings Dyke Bridge Update….Re-Tender Process..

Whittlesey level crossing bypass retendered.

Cambridgeshire County Council has begun the process of finding a new contractor to build its Whittlesey King’s Dyke level crossing scheme.

The council has published a contract notice in the Official Journal of the European Union (OJEU) putting the construction budget at £15.8m

The project involves construction of 1km of new road on structural embankments and a bridge over a railway to bypass the level crossing on the A605 at King’s Dyke, Whittlesey.

Kier was appointed to carry out detailed engineering design in August 2017 and it was given the construction contract in October 2018.

But when Kier submitted a final design and its price in July 2019, it came as something of a surprise. The initial budget had been £13.6m; the overall cost was going to be £39m, with the construction costs put at £26.2m. Kier was dropped.
The council is now hoping to find a contractor willing to build the same scheme for less than £16m.

The contract notice states: “The scheme was previously awarded as a two-stage design and build contract, for which a detailed design was completed. Cost estimates increased over time and so the authority is now seeking improved outcomes from the market.

“The provider will be required to take responsibility for the existing detailed design, but may seek approval from the authority as to where it may be improved.
The authority therefore welcomes value engineering exercises from the provider but notes that existing planning consent, site and technical constraints must be all upheld in any proposals which may come forward. Non-material amendments may be considered.”

Cambridgeshire County Council leader Steve Count said “I’m delighted to see that we’re moving forward – we’ve made our commitment to this scheme clear and this is a key date in our new programme that aims to get this scheme delivered as soon as possible.

“A shortlist of contractors that score highest in initial quality assessments will be issued the main invitation to tender at the end of November and will then have four months to submit bids. This keeps us on track for the appointed contractor to start construction by December 2020.”

©TheConstructionIndex

Posted in News | Comments Off on Kings Dyke Bridge Update….Re-Tender Process..

Household Recycling e-permit Scheme

From October 2019, you will need an e-permit to dispose of household waste at our nine Household Recycling Centres using a commercial-type vehicle or any trailer in excess of 1.5m length (excluding the towing mechanism) or 570 litre capacity.

E-permits are free of charge and will only be issued to Cambridgeshire residents on a per household basis. The e-permit allows a maximum of 12 visits to a site within a 12 month period. If you use up your allowance, you will have to wait until the 12 month period has passed to renew your e-permit.

A vehicle that requires a permit and is towing a trailer of any accepted size will count as two visits if they both contain waste.

Residents without internet access can obtain a permit by telephoning 0345 045 5207.

The following vehicles require a permit

  • Vans
  • Pick-ups / crew cabs
  • Campervans and minibuses with rear seats and fittings removed

Vehicles must be no larger than a standard Transit van (5m length and 2m high)

  • Trailers between 1.5m and 2.5m in length (excluding the towing mechanism) or 570 litre capacity

Hire vehicles that fit into the above categories, being used to dispose of household waste, also require a valid e-permit.

Vehicles excluded from site

  • Vehicles larger than a standard, short wheelbase low roof Transit van (5m length and 2m high)
  • Horse boxes
  • Tractors
  • Driver and van services
  • Trailers over 2.5m in length (excluding towing mechanism)

    Click here to apply for your free e-permit online

Posted in Issues and Concerns, News | Comments Off on Household Recycling e-permit Scheme

FDC Consultation – Universal Credit

Loading...
Posted in News | Comments Off on FDC Consultation – Universal Credit

Cyber Protect With 2FA

Posted in Crime Updates, News | Comments Off on Cyber Protect With 2FA

Mill Road Closure Planned 07/10/19

Loading...
Posted in News | Comments Off on Mill Road Closure Planned 07/10/19