Today after 3 weeks 3 days the FDC Contractor returned to our estate – to be fair ‘Frank’ did spend 16 minutes as opposed to the 4.5 minutes he had done last time, and made a somewhat better job that ‘he’/they’ had done before.
Still no where ‘perfect’ but at least acceptable for a while – we still have other ‘issues’ with the rest of the area and hopefully this will at some stage be addressed.
I also saw that the grass along the ‘Bower’ at Briggate East was done – a large lorry with a massif cutter on its ‘crane’ did ‘some sort of job – but left a ‘hedgehog’ by the railings.
-
-
7,000,000+ Hits // 9,000+ Posting
This is the 'Only' site with regular updates on community and council news.
Cllr Roy Gerstner is proud to have provided these Facts & Figures for over 14 years.