Today after 3 weeks 3 days the FDC Contractor returned to our estate – to be fair ‘Frank’ did spend 16 minutes as opposed to the 4.5 minutes he had done last time, and made a somewhat better job that ‘he’/they’ had done before.
Still no where ‘perfect’ but at least acceptable for a while – we still have other ‘issues’ with the rest of the area and hopefully this will at some stage be addressed.
I also saw that the grass along the ‘Bower’ at Briggate East was done – a large lorry with a massif cutter on its ‘crane’ did ‘some sort of job – but left a ‘hedgehog’ by the railings.
-
Statistics
- Whittlesey, GB11°Feels like: 8°CPartly Cloudy8:07 am3:50 pm GMT
Wind: 24km/h W
Humidity: 78%
Pressure: 1005.08mbar
UV index: 0SunMonTue7°C / 3°C
6°C / 3°C
12°C / 9°C