Today after 3 weeks 3 days the FDC Contractor returned to our estate – to be fair ‘Frank’ did spend 16 minutes as opposed to the 4.5 minutes he had done last time, and made a somewhat better job that ‘he’/they’ had done before.
Still no where ‘perfect’ but at least acceptable for a while – we still have other ‘issues’ with the rest of the area and hopefully this will at some stage be addressed.
I also saw that the grass along the ‘Bower’ at Briggate East was done – a large lorry with a massif cutter on its ‘crane’ did ‘some sort of job – but left a ‘hedgehog’ by the railings.
-
Statistics
- Whittlesey, GB9°Feels like: 7°CCloudy5:35 am8:20 pm BST
Wind: 16km/h ENE
Humidity: 73%
Pressure: 1005.08mbar
UV index: 2SunMonTue10°C / 4°C
16°C / 7°C
18°C / 9°C