Further to the previous posts, we have this morning received notification of the ‘Full Planning Application’ to import 250,000 tonnes per annum of ‘incinerator bottom ash’
(IBA) (previously 500,000 tonnes) and 50,000 tonnes per annum of construction and demolition (C&D) waste.
The consultation document is below and a link to Cambridgeshire CC Planning Portal for this application Ref CCC/21/024/FUL – Note when I looked earlier none of the 25 documents were showing up, they will in due course and I will advise further when available.
-
Statistics
- Whittlesey, GB7°Feels like: 4°CFog8:08 am3:52 pm GMT
Wind: 14km/h SW
Humidity: 99%
Pressure: 1021.67mbar
UV index: 0WedThuFri11°C / 7°C
9°C / 6°C
8°C / 6°C