This morning at 11:45 went to the site and spoke with the Site Manager – who informed me that all being well the road – A605 Peterborough Road will re-open tomorrow.
No time give as the top dressing will go on in the morning and will need to go off before the road is opened.
-
Statistics
- Whittlesey, GB5°Feels like: 2°CMostly Cloudy8:08 am3:51 pm GMT
Wind: 16km/h W
Humidity: 68%
Pressure: 1023.03mbar
UV index: 0TueWedThu13°C / 8°C
10°C / 7°C
9°C / 6°C