A47 Guyhirn Roadworks Update

Please find below details of upcoming overnight closures of the A47 at Guyhirn this week. Please do feel free to ask for any further information, and to disseminate more widely as appropriate.

The A47 Fen Road will be closed overnight for two nights this week, from Gull Road to the Guyhirn roundabout, for essential works. This will be from 8pm to 6am on Wednesday 16 and Thursday 17 March.

o    Eastbound traffic will exit the Whitepost roundabout at Thorney onto the A1139, then continue onto A605 Fletton Interchange, take the slip road onto the A605 through Whittlesey and Coates to the A141, and re-join the A47 at Guyhirn.

o    Westbound traffic will follow this diversion in reverse.


Posted in News | Comments Off on A47 Guyhirn Roadworks Update

SaxonGate – distribute 1,000 leaflets around Snoots/Peterboro Road


After last Thursdays inaugural residents meeting (see last weeks post) – the group raised enough funding to get 1,000 leaflets printed by Monday afternoon and were out first thing this morning delivering to residents/households in the area.

To see or follow – go to https://www.facebook.com/SaxonGatePE7/

Posted in News | Comments Off on SaxonGate – distribute 1,000 leaflets around Snoots/Peterboro Road

Meetings Last Night

I attended the monthly meeting of WTC Finance & Policy Committee, as I do regularly,
as a member of the public.
Items discussed..
1/ Equality & Diversity Policy  2/ CAPALC Affiliation 3/ Paperless Meetings
4/ Future funding of the heritage Centre  5/ Feedback required post grants
6/ What WTC may or may not fund under GPC 7 / WTC position on local promotion.

Of interest was The Heritage Centre – some indicative plans and basic drawings were shown. Funding (shortfall) is still very much on the agenda.

Immediately after was the WTC Planning Committee, with 3 members of the Public and
Mr Dino Biagioni MD of Rose Homes (EA) – who spoke during the Public Forum, concerns about Cambs Highways and a potential development along Eastrea Road/A605.
The agenda item for ‘The Monastery’ was deferred again until the April meeting as not all requested information had been submitted.

Posted in News | Comments Off on Meetings Last Night

FDC Chairman Starts The Platinum Jubilee Tree Planting

Whittlesey Town Council as you maybe aware are supporting the Queens Platinum Jubilee by hoping to plant 70 trees for the Queens Green Canopy Campaign.
I can inform you that as of today we have 55 trees sponsored.
If you would like a ‘Tree’ or more information then please contact me – details on the top toolbar.

 

Posted in News | Comments Off on FDC Chairman Starts The Platinum Jubilee Tree Planting

Drink Drivers Caught – Again

Posted in News | Comments Off on Drink Drivers Caught – Again

Want To Hear Some Good Band Music

Posted in News | Comments Off on Want To Hear Some Good Band Music

WTC Planning Agenda – 14th March 2022

Posted in News | Comments Off on WTC Planning Agenda – 14th March 2022

Comments on the Johnsons Agreggates Planning Application

This upcoming application to process some 250,000 tonnes of Bottom End Ash and 50,000 tonnes of construction and waste material is nearing the end of the consulation period.
If you wish to make any representation you need to do so by 18th March

e-mail to planningdc@cambridgeshire.gov.uk

Title: Former Saxon Brickworks CCC/21/024/FUL

Below is part of an objection put together by Mr Clive Vaughan.
(You can only object on planning grounds and not just because you don’t like it.)
DON’T FORGET TO PUT YOUR NAME AND POSTAL ADDRESS AT THE END OF EACH OBJECTION.

Our Health Johnsons Aggregates & Recycling Ltd assures us that Incinerator Bottom Ash is a non-hazardous material.

Other points of objection could be:

Highways. 96 HGV movements per day (48 in and 48 out). This would result in a predicted 6 HGV movements in the morning peak hour and 3 in the evening peak. This represents a serious escalation of heavy traffic on the very busy A605. This expansion will add considerably to vehicle noise and air pollution. 

Road Safety is also a key issue with 48 lorries turning right into Saxon from the direction of Peterborough every day on average with 6 in the busy morning peak hour, increasing accident risk. Such heavy traffic also results in the A605 road surface being constantly muddy and dangerously slippery in wet weather. 

Noise. Modelling by Clements Acoustics Consultancy is against a ‘nothing changes’ scenario. But more heavy traffic will lead to more potholes on the already battered A605 road surface. When a fully laden lorry hits an A605 pothole our houses shake, and the impact can be heard over the TV. 

The nature of the proposed loads. Incinerator bottom ash may well be non-hazardous but construction and demolish waste sounds like something to be very wary of. How will the contractor guarantee that every single load will be “non-hazardous material” especially of construction and demolish waste when asbestos is in many demolished buildings.

Dust. It is hard to see how 48 lorries per day, carrying loads of IBA and C&D along the pock-marked surface of the A605 can avoid spewing dust, to aggravate the breathing problems of vulnerable Whittlesey residents.

Operating times. Importation and depositing on site, in the designated storage areas, of IBA and C&D material – 24/7 including Sundays and Bank Holidays (except Christmas Day). Round the clock arrival of vehicles is unacceptable to a site just 250 metres of people’s homes.

Direction of lorries. Johnsons Aggregates assure us in their supporting planning documentation that all lorries will enter and leave the site from the direction of Peterborough. Really? No lorry driver will want diesel/fags/coffee/snacks etc and turn east towards Whittlesey to get these!!

Environmental impact. An estimated 6,600 tonnes of CO2 per annum just from the diesel burnt to get all this waste from Nottinghamshire. Then there is nitrogenous oxide and particulate pollution from burning diesel, from brake linings and wear of tyres. 

Damage to road surfaces. The A605 already suffers considerable pounding from the high level of HGV traffic. Seeking to further increase such traffic will only push up the cost of repairs. 

IF YOU HAVE ALREADY MADE AN OBJECTION, PLEASE DO SO AGAIN CITING ADDITIONAL POINTS OF OBJECTION – AND TWO OR MORE PEOPLE IN A HOUSEHOLD OBJECTING INDIVIDUALLY COUNTS MORE THAN ONCE.

EVEN MORE EFFECTIVELY, OBJECT POINT BY SEPARATE POINT SO THAT YOU ARE SUBMITTING MULTIPLE OBJECTIONS!!!

DON’T FORGET TO PUT YOUR NAME AND POSTAL ADDRESS AT THE END OF EACH OBJECTION.

Posted in News | Comments Off on Comments on the Johnsons Agreggates Planning Application

KD X Update

Watch the video by Clicking Here

Following on from the comms survey we carried out, some of you said it would be good to have the fortnightly progress update message as a video…so this week we spoke to Rhydian Hafal, construction manager at Jones Bros. He’s discussing activity on-site, with a focus on the work at the western roundabout and Rhydian’s update also includes information on the traffic management over the next few weeks.


 

Posted in News | Comments Off on KD X Update

Help – Catalytic Converters Stolen

Can you help? We’re appealing for dash cam or CCTV footage after four catalytic converter thefts took place across the county earlier this week involving a silver or light-coloured Audi.

The cat converter thefts happened on:

  • Creek Road, March (between 6-7pm on 7 March). Crime reference 35/16304/22.
  • Pound Lane, Sutton, Ely (between 6-6.30pm on 7 March). Crime reference 35/16321/22.
  • Viking Way, Bar Hill (between 3.30-3.35pm on 7 March). Crime reference 35/16527/22.
  • Pheasant Rise, Bar Hill (between 1-1.30am on 9 March). Crime reference 35/16688/22.

We’re treating the crimes as linked and if you have any footage or information that could help us, no matter how small or insignificant it may seem, contact us online or call 101 quoting the relevant crime reference number above. Please note, we cannot accept information sent via ecops.

For more info and advice about catalytic converter thefts, visit our
dedicated catalytic converter web page
.

Thank you,
Corporate Communications

Posted in Crime Updates, News | Comments Off on Help – Catalytic Converters Stolen

Residents Have Meeting Re-Saxon Works

Residents held their own meeting today at The Falcon, very well attended by 60 or so from mainly the Snoots Road area. Chaired by Mr Tony Ellingford who kept the momentum moving, I attended as an invited guest.
Residents raised the ongoing concerns of noise and smell
allegedly coming from the site. The historic non-conforming waste issues and the impending Johnsons Aggregates Planning Application.
The group formed a sub-committee and asked for support to print and deliver a pamphlet informing a wider area of their concerns.


Posted in News | Comments Off on Residents Have Meeting Re-Saxon Works

PYP – Taking Off Very Well

The Whittlesey Phoenix Youth Provision Group are making excellent progress with support from Cambs CC and Volunteers.
Get in contact if you or your children want to get involved.

(click on picture to enlarge)

Posted in News | Comments Off on PYP – Taking Off Very Well