Bower Footbridge Update 110826

Message from CCC Cllr Michael Fisher – According to his records, the bridge was last inspected on 7 July 2026, with no major concerns identified by the engineer at the time.

However, following the recent concerns that have been raised, Gareth has instructed M Group engineers to carry out a further follow up inspection as soon as possible.

This entry was posted in News. Bookmark the permalink.