The A605 Road Re-surfacing works will begin 01st November – they will be working nightime between 20:00 and 06:00 – The road will be closed.
-
Statistics
- Whittlesey, GB-2°Feels like: -2°CFog6:02 am6:13 pm GMT
Wind: 5km/h ENE
Humidity: 95%
Pressure: 1022.35mbar
UV index: 0ThuFriSat19°C / 6°C
18°C / 11°C
16°C / 7°C