To say I’ve been ear-bashed a lot recently over the never ending issues of ‘Traffic’ within Whittlesey and the A605.
We can make as much representations as we like, no one appears to be listening
(what a surprise).
The City Cable Installers seem to be here for-ever – (The Chinese cabled up most of Shanghai within 12 months).
As my correspondence shows, Barr Street grid-locked because of using Broad Street as a ‘rat-run’. I am making calls to deaf ears…?
-
Statistics
- Whittlesey, GB6°Feels like: 5°CCloudy8:01 am3:48 pm GMT
Wind: 6km/h ENE
Humidity: 91%
Pressure: 1027.43mbar
UV index: 0SatSunMon7°C / 4°C
12°C / 10°C
12°C / 7°C