Flood Warning: North Bank Road Alongside The River Nene 19:01

A Flood Warning has been issued by the Environment Agency.

Flood Warning in force: North Bank Road alongside the River Nene, east of Peterborough and west of Dog-in-a-Doublet Sluice.
Flooding is expected for: North Bank Road alongside the River Nene to the east of Peterborough and the West of the Dog-in-a-Doublet Sluice.   

Immediate action required.

Heavy rain has fallen in the Peterborough area which is causing the River levels to rise on the River Nene. During periods of high tide the River Nene will be unable to discharge into the sea, resulting in tide lock conditions. This is likely to lead to localised flooding of the North Bank Road, between Peterborough and Rings End from this evening.
Whilst this Flood Warning is in force, the Local Authority will close North Bank Road. Diversionary routes will be put in place and further updates will be available through local media.
Please avoid using low lying footpaths near local watercourses and plan driving routes to avoid low lying roads near rivers, which may be flooded.
We are closely monitoring the situation and this message will be updated by 17:00 on 20/12/2024, or before if the situation changes.

Posted in News | Comments Off on Flood Warning: North Bank Road Alongside The River Nene 19:01

Presentation Given To WTC Last Month – Science Park

Full details on Fenland Council website under planning applications.

F/YR24/0903/O | Erect up to 65,000 sq m floor space consisting of E (b)(d)(f) (amenity buildings) and E (G)(i)(ii)(iii) (office, laboratory and manufacturing) including renewable energy infrastructure, parking, country park and other associated infrastructure (outline application with matters committed in respect of access and layout) | Land Adjacent New Saxon Works Peterborough Road Whittlesey Cambridgeshire

Science Park Presentation WTC
Posted in News | Comments Off on Presentation Given To WTC Last Month – Science Park

Still Awaiting More Details Re Kings Dyke Ralph Butcher Causeway

May I thank all those who have sent/copied me in letters and e-mails sent to Cambs CC/Highways Director and Mr Moir the CEO.
Most have had replies, not all exactly the same but similar.

We may get more news before the Christmas shut down….
My sources tend to think that the Bridge will be closed whilst repairs/resurfacing takes place and should this be the case, Whittlesey may well become an island once more.

As always we wait and wait…..

Below one of the many e-mails I have received….

KDX Letter Dear Dr Moir
Posted in News | Comments Off on Still Awaiting More Details Re Kings Dyke Ralph Butcher Causeway

Official Cambs CC KDX Update


Posted in News | Comments Off on Official Cambs CC KDX Update

Breaking News From John Elworthy Updated 19/12/24

Confused, the first part of the post refers to the Benwick Road Whittlesey – Road Works
The second part refered to the Kings Dyke Crossing…

Posted in News | Comments Off on Breaking News From John Elworthy Updated 19/12/24

WTC Full Council Agenda – Tomorrow 19th December

WTC Full Council Agenda Thursday 19th December 2024
Posted in News | Comments Off on WTC Full Council Agenda – Tomorrow 19th December

Would You or Your Organisation Benifit From This Free Training.

This is available free to community group leaders….you need to contact CCVS.

Posted in News | Comments Off on Would You or Your Organisation Benifit From This Free Training.

Barry Has A Go @ The Police & Crime Commissioner

However ….. The PCC’s Office came back with a reply (good/bad/ or indifferent) pretty quickly….

Cllr Barry Wainwright Has This To Say About the PCC

Posted in News | Comments Off on Barry Has A Go @ The Police & Crime Commissioner

Electronic Highway Information Board – A605 West of Whittlesey

For a number of days one the A605 electronic highway information boards West of Whittlesey has gone in to melt down.

On a number of occasions I have reported an intermitted fault and the problem has been resolved but appears to be only a short term fix.

An engineer has visited the site and diagnosed the problem. A part is on order and Cambridgeshire County Council TMC department are chasing to resolve the problem, hopefully before Christmas.

Kind regards,

Dee
Councillor Mrs Dee Laws

Posted in News | Comments Off on Electronic Highway Information Board – A605 West of Whittlesey

Flood Warning No Longer In Force.

NO LONGER IN FORCE. Flood Warning: B1040 Thorney to Whittlesey Road to the South of the River Nene.

This is a message from the Environment Agency.

Flood Warning no longer in force: B1040 Thorney to Whittlesey Road to the South of the River Nene.
The situation is improving and no further flooding is expected in this area.
Flood Warnings and Alerts may still be in force for surrounding areas.

The River Nene has being falling steadily over the last 24 hours.
The B1040 road will be reopened once the Highways Authority have been able to inspect the road surface and carry out any necessary works to ensure the road is passable.

There may be standing water in low lying areas and fields for several days.

Posted in News | Comments Off on Flood Warning No Longer In Force.

Future of Fenlands Leisure Centres

Fenland District Council, are/have been conducting a plan for the future of leisure centres within Fenland, they have brought in consultants who have visited all the sites.
We (Councillors) thought that a report was going to be presented to FDC’s cabinet in September.

When I asked the portfolio holder for leisure Cllr Miscandlon yesterday for any updates, he informed that the report has gone back to the consultants for further work, and that it was not expected back until next year sometime?

Posted in News | Comments Off on Future of Fenlands Leisure Centres

Maybe An Update Coming Soon On The Kings Dyke Ralph Butcher Causeway

At today’s full Fenland District Council meeting I asked the leader Cllr Chris Boden the following question.

“Can I please be informed whether there is any update on the Ralph Butcher Causeway, a letter has been received from Alex Beckett the chair of Highways and Transport at Cambs CC. He sent that there was a contract dispute between CCC and the Contractor.
Will this hold up even longer any action in fixing the issues.

Does this start to look like The Guided Busway case between BAM Nuttall & CCC.
Is there any update please.”

Cllr Boden responded that an hour to answer may not be long enough, he gave no specifics however acknowledging the terrible chaos that the holdups Whittlesey residents are having to put up with, he was doing his best to get answers but it was difficult.
He gave as good a reply that he was able too

He is trying to get information and will release when ever he can.
Some history on the previous problem(s) – his answers took around 8 minutes.

You can watch the full answer to my question on FDC’s YouTube Channel from
16 minutes into the meeting

https://www.youtube.com/watch?v=q2ckNxZ92aw

He is having a meeting tomorrow (Tuesday) with the Director of Highways.

Cllr Clark stated that Kier had walked away from the project – watch his question at
31 minutes into the meeting.
Good answer back from Cllr Boden.

Posted in News | Comments Off on Maybe An Update Coming Soon On The Kings Dyke Ralph Butcher Causeway