We are all aware of the poor state of the A605 coming from Coates through Whittlesey.
This morning I spoke with the Highways Engineer responsible for Whittlesey, as I could see nothing planned on the Cambs CC Highways schedual.
He told me that a complete resurface of the A605 from Dandelion Drive to the Cemetery Road Round-About is planned for this financial year……However…..
He also said that things can change? – depending on the Councils financial state.
(Cambs CC).
-
Statistics
- Whittlesey, GB27°Feels like: 27°CSunny5:40 am8:29 pm BST
Wind: 16km/h SW
Humidity: 33%
Pressure: 1008.13mbar
UV index: 5WedThuFri21°C / 12°C
25°C / 14°C
23°C / 10°C