After several months waiting for the toilets to have parts made, they were is use for exactly One Day – One toilet had its Light Fitting ripped out – I just don’t understand these people who get something out of destroying things
-
Statistics
- Whittlesey, GB9°Feels like: 7°CSunny6:18 am7:47 pm BST
Wind: 13km/h ENE
Humidity: 72%
Pressure: 1027.77mbar
UV index: 1TueWedThu16°C / 1°C
13°C / 4°C
17°C / 5°C