Update On Buttercross Improvements

Whittlesey Buttercross.
The following improvements are planned and due to complete before March 2025

o Remove phone box

o Reposition salt bin to alley way next to George Pub

o Remove bike rack outside Betfred

o Add a differing coloured tegula block every third block to highlight potential trip
hazard

o Assess integrity of all Buttercross columns for future works if necessary

o Refurbish benching & paint additional wheat stalks / black bike racks /
galvanised traffic signage / planters (where necessary)

o Assess drop bollards and replace as necessary; use lightweight lockable bollards
& locate storage unit adjacent to litter bin beside George Pub.
Remove temporary fencing once bollards are addresses.

This entry was posted in News. Bookmark the permalink.