To say I’ve been ear-bashed a lot recently over the never ending issues of ‘Traffic’ within Whittlesey and the A605.
We can make as much representations as we like, no one appears to be listening
(what a surprise).
The City Cable Installers seem to be here for-ever – (The Chinese cabled up most of Shanghai within 12 months).
As my correspondence shows, Barr Street grid-locked because of using Broad Street as a ‘rat-run’. I am making calls to deaf ears…?
-
Statistics
- Whittlesey, GB8°Feels like: 5°CClear7:38 am3:56 pm GMT
Wind: 23km/h SW
Humidity: 71%
Pressure: 1002.03mbar
UV index: 0TueWedThu9°C / 2°C
6°C / -1°C
6°C / 1°C