To say I’ve been ear-bashed a lot recently over the never ending issues of ‘Traffic’ within Whittlesey and the A605.
We can make as much representations as we like, no one appears to be listening
(what a surprise).
The City Cable Installers seem to be here for-ever – (The Chinese cabled up most of Shanghai within 12 months).
As my correspondence shows, Barr Street grid-locked because of using Broad Street as a ‘rat-run’. I am making calls to deaf ears…?
-
Statistics
- Whittlesey, GB12°Feels like: 12°CRain Shower4:46 am9:24 pm BST
Wind: 8km/h NNW
Humidity: 94%
Pressure: 996.95mbar
UV index: 0SunMonTue18°C / 9°C
21°C / 13°C
20°C / 15°C