To say I’ve been ear-bashed a lot recently over the never ending issues of ‘Traffic’ within Whittlesey and the A605.
We can make as much representations as we like, no one appears to be listening
(what a surprise).
The City Cable Installers seem to be here for-ever – (The Chinese cabled up most of Shanghai within 12 months).
As my correspondence shows, Barr Street grid-locked because of using Broad Street as a ‘rat-run’. I am making calls to deaf ears…?
-
Statistics
- Whittlesey, GB6°Feels like: 3°CFog6:35 am5:48 pm GMT
Wind: 11km/h SSW
Humidity: 70%
Pressure: 1017.95mbar
UV index: 0ThuFriSat17°C / 8°C
15°C / 6°C
17°C / 5°C