To say I’ve been ear-bashed a lot recently over the never ending issues of ‘Traffic’ within Whittlesey and the A605.
We can make as much representations as we like, no one appears to be listening
(what a surprise).
The City Cable Installers seem to be here for-ever – (The Chinese cabled up most of Shanghai within 12 months).
As my correspondence shows, Barr Street grid-locked because of using Broad Street as a ‘rat-run’. I am making calls to deaf ears…?
-
Statistics
- Whittlesey, GB9°Feels like: 8°CMist8:08 am3:52 pm GMT
Wind: 13km/h SW
Humidity: 95%
Pressure: 1028.78mbar
UV index: 0WedThuFri11°C / 7°C
9°C / 6°C
8°C / 5°C