Manor Leisure Centre Update

Now with all the latest high-tech equipment installed last week (a year over schedule)…
I am informed everyone is very pleased.

Today the main lighting in the Swimming Pool area was being changed – this was already done in 2016 (LED) however it was the wrong specification and is now being replaced.

The ‘really’ good news is that on last Bank Holiday (The Gym & Pool Closed) –
The area
was ‘Carbon Neutral’ with as much equipment turned off as possible.
There are Solar Panels on the roof and Combined heat and power (CHP) which integrates the production of usable heat and power (electricity), in one single, highly efficient process. CHP generates electricity whilst also capturing usable heat that is produced in this process.

There is still a good deal of ‘maintenance work’ required on the fabric of the building (swimming pool) and the changing rooms are in need of some TLC….
Still there has been some good improvements so far…. Let us hope the work carries on.

This entry was posted in News. Bookmark the permalink.