This afternoon I went for a ride on my ‘truck’ to see how the road works are progressing.
Whilst I sat there 3 cars came, opened up the barriers, closed the barriers and went on their way…long detour not required ! – but the road surface is still to be finished.
-
Statistics
- Whittlesey, GB10°Feels like: 7°CFair7:38 am3:56 pm GMT
Wind: 26km/h SW
Humidity: 63%
Pressure: 1000.68mbar
UV index: 0TueWedThu9°C / 3°C
6°C / 0°C
6°C / 1°C