This afternoon I went for a ride on my ‘truck’ to see how the road works are progressing.
Whilst I sat there 3 cars came, opened up the barriers, closed the barriers and went on their way…long detour not required ! – but the road surface is still to be finished.
-
Statistics
- Whittlesey, GB6°Feels like: 2°CCloudy7:44 am4:42 pm GMT
Wind: 18km/h WSW
Humidity: 88%
Pressure: 998.65mbar
UV index: 0ThuFriSat8°C / 1°C
7°C / 3°C
7°C / 2°C